Room addition foundation in Elmhurst
An open side yard turned into an attached garage, with a master suite going on top. Squeezed in between the house, the neighbor's place and a backyard gazebo. Dug on a Wednesday. Walls poured and stripped by the next Wednesday.
The job
This one was for builder Dan Wangler. Abel has worked with him for years, and Abel is the only concrete contractor he uses. The house is a brick bungalow in Elmhurst with an open side yard. The side yard became an attached garage, and Dan is putting a big master suite on top of it. Abel also tore down the old two car garage out back, hauled out all of its concrete and backfilled the spot with dirt.
Before · Oct 15A tight lot, no hiccups
Look at this lot. The house on one side, the neighbor's house a few feet away on the other, a gazebo at the back and old trees overhead. The back corners are angled, not square, which means more forming and more measuring. None of it slowed the job down. The crew worked the machines in and around all of it without a problem, and the whole job went off without a hiccup.

How we did it
Plastic went down over the landscaping before the dig. The trenches went in between the two houses on October 15th, and the footings were poured the next day.


The wall forms were set on October 17th, angled corners and all. By October 22nd the walls were stripped and the gravel base was spread.

Out back, the old detached garage came down. Abel hauled out all of its concrete and backfilled the spot with dirt.
What the builder got
After · Oct 22One week from the first bucket of dirt to stripped walls and a gravel base, and about 17 days on site for the whole job, garage teardown included. Nothing came back. Dan was happy with it, and he already has Abel pricing the next jobs he has coming up.