Case studies

Three additions. Three foundations.

Every builder asks the same thing before he hands a foundation to somebody new: what does this guy actually do when he gets on site. So here are three room additions, in Wheaton, Oakbrook Terrace and Elmhurst, start to finish. The access, the dig, the pour, and what the framer walked onto.

Every job, not just these three

The parts that do not change.

Three different lots, three different towns, three different sets of problems. These are the things that were the same on all of them.

1

One crew digs it and pours it

The excavating and the concrete are the same company and the same men. No separate excavator to schedule, no gap between the two, and nobody to blame if the hole is wrong.

2

Six bag mix, every pour

There is a cheaper way to order concrete and Abel does not order it. Same mix on a garage floor as on a foundation wall.

3

The neighbors get handled first

Abel is usually the first trade on the lot and the one on the property line at six in the morning. John has that conversation before the equipment shows up, so it stays off the builder's plate.

Got an addition coming up this season?